Sludge Dewatering Machine in Small Scale Stone Mining for River Sand and Slurry Treatment Filter Press

Sludge Dewatering Machine in Small Scale Stone Mining for River Sand and Slurry Treatment Filter Press

5.2 Operation steps 5.2.1 The insertion board of transport pan is lowered to the ground. The specific operations are shown in Figure 2-3 Operation Diagram. 5.2.2 Operate the machine to move forward, gather the stone together, and then level the ground. 5.2.3 Confirm that the transferring vehicle...
Send Inquiry
Product Introduction

Our company has always been at the forefront of the domestic Underground Mucking Machine, Mucking Loader With Breaking Hammer, Tunnel Mucking Loader industry and has a certain international influence. We believe in delivering results and are committed to helping you achieve your goals. We have a strong commitment to quality assurance, working closely with manufacturers to ensure the highest standards of production. We believe in the importance of building long-term relationships based on trust and mutual respect with our customers.

Small Mining Machine

5.2 Operation steps

5.2.1 The insertion board of transport pan is lowered to the ground. The specific operations are shown in Figure 2-3 Operation Diagram.

5.2.2 Operate the machine to move forward, gather the stone together, and then level the ground.

5.2.3 Confirm that the transferring vehicle enters into the unloading part of the machine, and then the handle is pulled to the position of positive transport.

5.2.4 Operate the pilot valve so that the big arm is lifted up, small arm is extended out, and then the bucket is placed in the position which aligns with the small arm. And then the big arm is lowered, small arm is withdrawn (big arm is jogging up and down), so the stone can be grilled into the transport pan. The rotary arm can pick stones in a wide range. The appropriate withdrawal and extension of bucket according to different distances will facilitate stone picking. During picking, all kinds of arms cannot be moved to the limit position, so as to avoid frequent transition impact and shorten the service life of the machine. Meanwhile, it can avoid high temperature caused by frequent overflow due to overload valve. It shall be specially noted that the bucket cannot directly hit the transport pan, otherwise it will cause the serious deformation of the transport pan.

5.2.5 During picking, always check whether the scraper chain is in the normal delivery. If stuck, the delivery shall be promptly stopped. Otherwise, the temperature will rise rapidly due to overload, and then the machine cannot continue to work. The method to solve clamping of scraper chain: the joy stick for positive transport is pulled in the neutral position; the joy stick for transport is pulled back and forth so that the scraper chain achieves quick positive

 

       and negative impact so as to release the scraper chain. When there are stones in the transport pan, the transport joy stick cannot be stopped in the position of negative transport, otherwise the chain or scraper may be broken, seriously affecting production.

5.2.6 To stop during walking, the pilot valve of brake pedal can be placed in the neutral position. For long-time parking, the shovel plate in front of machine shall be pressed on the ground.

5.2.7 Before walking or reversing of loader, the bell shall be started as a warning signal.

General drawing:

electrical motor & oil pump assembly:


119


Our commitment is to provide high quality Sludge Dewatering Machine in Small Scale Stone Mining for River Sand and Slurry Treatment Filter Press and create more value for customers, proving that we are the most trusted partner in this sector by hard work. In line with the business philosophy of quality first and reputation first, we take the pursuit of first-class products and service to global customers as our goal. In response to the needs of customers, we try to complete the work with high quality and efficiency in a good attitude.

Send Inquiry

Home

skype

E-mail

Inquiry