Side Dumping Loader for Coal Mine/Side Dumping Loader

Side Dumping Loader for Coal Mine/Side Dumping Loader

Service environment of crawler loader a). The section is a laneway of above 2.0×2.0 m. b). The Platts hadrness of rocks (f) is less than 12, the lumpiness is less than and equal to 400mm; the loose density is not more than 1.8t/m 3 . c). Altitude≤1000m; special design is necessary for plataeu...
Send Inquiry
Product Introduction

In the context of today's times, we are committed to developing green Wheel Mucking Loader, Underground Tunnel Haggloader, Mucking Loader Machine in order to seize the market opportunities. We offer a wide range of value-added services to meet our customers' needs. Our team is experienced in managing risk and ensuring smooth operations in international trade.

Coal Mine Loader

Service environment of crawler loader

a). The section is a laneway of above 2.0×2.0 m.

b). The Platts hadrness of rocks (f) is less than 12, the lumpiness is less than and equal to 400mm; the loose density is not more than 1.8t/m3.

c). Altitude≤1000m; special design is necessary for plataeu environment with an altitude of more than 1000m.

d). Laneway environment is -5℃~+40℃; the max relative humidity ≤90% (when the temperature is 25℃).

e). The limit deviation of voltage is ±5%; the limit deviation of AC frequency is ±1%.

f). The laneway gradient ≤10°; special design needs to be conducted or necessary measures need to be adopted when working in the tunnel with a laneway gradient of more than 10°.

g). When the loader works, the surrounding coal-dust and methane explosive gas content shall conform to the safety content set forth by coal safety procedures.Coal Mine Loader


Products Advantage:

Compact structure

Easy to operate and maintain

Stable and durable performance

High efficiency and saving man power

Energy conservation and environment protection

Dumping height and loading distance can be customize according to your working condition.

If your mine is big slope,we can customize right machine for you,the biggest working tunnel slope is 30 degree.

Our products are safe and stable with explosion-proof electric motor for coal mine.

The machine is driven by electric and hydraulic power,walking by hydraulic.Coal Mine Loader


FAQ:

Q: What is the delivery time ?
A: Normally the leadtime is 10 days after receipt of 30% deposit.

Q: What is the Payment terms ?
A: TT OR LC.

As a contract-abiding and credit-abiding enterprise, honesty is the core value of our enterprise. We continuously develop and research new production technology to fulfil market demand and meet customers' different requirements for the Side Dumping Loader for Coal Mine/Side Dumping Loader. In order to ensure the quality of products, our company has introduced advanced equipment, established a complete quality management system, and strictly implemented quality management, so our company's products have gained a good reputation in the industry. With the care of government departments at all levels, our company has achieved good development, its industry status has been significantly improved, and a series of honors have been obtained.

Send Inquiry

Home

skype

E-mail

Inquiry