
Continuous Centrifuge Dewatering Machine/Mining Dehydration Machine
As an honest seller, we always use excellent raw materials, advanced equipment, and skilled technicians to ensure that our Electric Excavator For Coal Pillar, Underground Coal Loader, Underground Crawler Excavator have high quality and stable performance. We are committed to delivering exceptional customer service, going above and beyond to ensure that our clients are satisfied with every interaction. With the comprehensive and internationalization of market competition, our company is constantly in line with international standards. We have a large scale of standardized production lines, good product quality is the foundation of business survival. Our products are designed with user feedback and input in mind.
Continuous Mining Machine
Starting
Before the mucking loader is started, ensure that the driver is familiar with the operation manual, especially the chapter "general safety rules". Before starting, check whether all the levers are in the neutral position (stationary position), so that there are no unexpected action when the equipment is started. During the function test, the irrelevant personnel (except the operator) are not allowed to enter the working area of the mucking loader, otherwise they may be easily injuried!
Turn on the power master switch and then press the motor start button.
The loader is equipped with phase sequence protector which can avoid machine damages caused by motor reversal due to wrong phase sequence. If the loader cannot be started, please first change any two-phase wire connections of power supply and then restart it.
The hydraulic pump shall be exhausting again.
When the hydraulic system is exhausting, no one is allowed to be located within the scope of movement work of the working mechanism and the transport mechanism. Because the working mechanism and the transport mechanism may have unexpected movements, it may lead to serious injuries.
The exhausting of hydraulic system is achieved through several movements of hydraulic actuator.
Check the leakage of hydraulic system.
After 10-second startup is completed, the machine can be used with pressure. When the machine is shut down for more than 4 hours, the pump shall be idling for 5 ~ 10 minutes before the machine is working with pressure.
General drawing:

Continuous Mining Machine
We will closely integrate market development trends and the needs of consumers, and will be courageous in innovating and continually improving our Continuous Centrifuge Dewatering Machine/Mining Dehydration Machine. Through years of development, we have laid a solid industry foundation and formed a strong sales network that our products have spread all over the country. At present, the production and operation of products up to thousands of specifications.
You Might Also Like
Send Inquiry










