
Mining Equipment, Jaw Crusher, Small Stone Crusher Machine (CPE)
Our company is committed to the R & D, design and production of Tunnel Mucking Loader In Mining, Mining Tunnel Excavator, Coal Unloader with the business philosoph of integrity and win-win. Our products are designed with safety and ease of use in mind. We strengthen our brand awareness, win the trust of users and gain public support with a good brand image, in order to maintain a competitive advantageous position. Our company takes pride in our ability to build strong, lasting relationships with our customers, based on mutual trust, respect, and effective communication. Our products are sold all over the world and are well received by domestic and foreign customers with our professional research and development personnel.
Small Mining Machine
5.2 Operation steps
5.2.1 The insertion board of transport pan is lowered to the ground. The specific operations are shown in Figure 2-3 Operation Diagram.
5.2.2 Operate the machine to move forward, gather the stone together, and then level the ground.
5.2.3 Confirm that the transferring vehicle enters into the unloading part of the machine, and then the handle is pulled to the position of positive transport.
5.2.4 Operate the pilot valve so that the big arm is lifted up, small arm is extended out, and then the bucket is placed in the position which aligns with the small arm. And then the big arm is lowered, small arm is withdrawn (big arm is jogging up and down), so the stone can be grilled into the transport pan. The rotary arm can pick stones in a wide range. The appropriate withdrawal and extension of bucket according to different distances will facilitate stone picking. During picking, all kinds of arms cannot be moved to the limit position, so as to avoid frequent transition impact and shorten the service life of the machine. Meanwhile, it can avoid high temperature caused by frequent overflow due to overload valve. It shall be specially noted that the bucket cannot directly hit the transport pan, otherwise it will cause the serious deformation of the transport pan.
5.2.5 During picking, always check whether the scraper chain is in the normal delivery. If stuck, the delivery shall be promptly stopped. Otherwise, the temperature will rise rapidly due to overload, and then the machine cannot continue to work. The method to solve clamping of scraper chain: the joy stick for positive transport is pulled in the neutral position; the joy stick for transport is pulled back and forth so that the scraper chain achieves quick positive
and negative impact so as to release the scraper chain. When there are stones in the transport pan, the transport joy stick cannot be stopped in the position of negative transport, otherwise the chain or scraper may be broken, seriously affecting production.
5.2.6 To stop during walking, the pilot valve of brake pedal can be placed in the neutral position. For long-time parking, the shovel plate in front of machine shall be pressed on the ground.
5.2.7 Before walking or reversing of loader, the bell shall be started as a warning signal.
General drawing:
electrical motor & oil pump assembly:

With the changes of the market, we will further improve the scientific and technological content of our Mining Equipment, Jaw Crusher, Small Stone Crusher Machine (CPE), and constantly introduce new products to meet the needs of our customers, so that our products and the progress of the society perfectly combined. I also sincerely hope that new and old customers come to our company to negotiate business. Now, we are trying to enter new markets where we do not have a presence and developing the markets we have now the already penetrated.
You Might Also Like
Send Inquiry










