The timing maintenance period of downhole Loader

1. Underground Loader According to the provisions of the regular maintenance and lubrication

2. Underground loader engine start to 55 ℃ and air pressure expression to 0.4mpa after the start of driving

3, downhole Loader driver wear should meet the requirements, and wear the necessary protective equipment.

4, when the control boom and the bucket to achieve the desired position, the joystick should be pushed (pull) back to the middle position

5, downhole with the loader to move in the forward file do not have to stop, do not have to step on the brake board, from low speed to the first Panasonic throttle control gear lever at the same time, and then under the empty operation to the water temperature up to the throttle, from high-speed change at low speeds, first increase the throttle, so that the gearbox output shaft and 

6, downhole use loader diesel engine inlet and outlet water temperature reached 55 ℃, oil temperature reached 45 ℃ to allow Full-load operation, the operation is the generator water temperature, oil temperature does not exceed 95 ℃, torque converter oil temperature not more than 120 ℃. Stop when the oil temperature of the heavy duty operation exceeds the allowable Value.

7, The bucket should not be lifted to a high position when transporting materials, carrying materials to keep the boom hinge point off the ground 500mm to ensure stable travel.

8, change the direction of the forward and backward requirements in the car after the stop

9, the mining Road loader in the area of the operation of small or dangerous areas, the mine loader can add side-turning device 10, downhole with the loader in the hinge area for maintenance or inspection work, to install the ' anti-rotation lever ' to prevent the front and rear frame relative rotation.