
Mini Tunnel Excavator
Mini Tunnel Excavator
Daily servicing work
For the daily servicing work, the following works shall be completed by specific operators:
No. | Check item |
1 | Check the tension of track/chain, left & right |
2 | Check joints and the base plate of track/chain, left & right |
3 | Check the mucking loader for oil leakage (The hose joint shall be firmly locked when any hose or hose joint is re-tightened, so as to avoid twisting) |
4 | Check the tension of triangle belt |
5 | (In order to avoid condensate formed prior to the next start, the fuel tank shall be fully filled up after use every day. After filling-up, the filler cap shall be closely tightened to ensure tightness) |
6 | Check the air filter element |
7 | Check the hydraulic cylinder head/cooling fins |
Check of operating mechanism
No. | Check item |
1 | Check possible cracks through visual check |
2 | Check hoses for leakage (The hose joint shall be firmly locked when any hose or hose joint is re-tightened, so as to avoid twisting) |
3 | Check hoses for wear |
4 | Check the hydraulic cylinder for wear and leakage |
5 | Check the copper bush for wear or movement |
6 | Check the damper gear for wear |
7 | Check bolts and the housing |
8 | Check bucket teeth and fixing devices |
9 | Check whether nuts on the grab tilting lever are well fixed |
Hot Tags: mini tunnel excavator, China, factory, suppliers, manufacturers, cheap, price, Underground Mining Excavator, Underground Digging Machine, Crawler Excavator, Tunnel Excavator, Mining Excavator, Mining Underground Excavator
Previous
Crawler ExcavatorYou Might Also Like
Send Inquiry











