Commissioning of equipment Adjust the pressure of safety valve on the gear pump: 1) 10MPa pressure gauge is connected to the pressure tap at the outlet of gear pump. 2) Loosen the safety valve of gear pump, and then block the pump outlet; 2) Start the motor and then adjust the pressure of safety...
Send Inquiry
Product Introduction

Each individual member from our large performance revenue crew values customers' needs and company communication for Coal And Mineral Loading Machine, Underground Excavator, Underground Wheel Loader . Although the competition is particularly fierce, we produce and sell ourselves, take customer needs as the purpose, take actual experience as a guide, and combine brand advantages to create a road to our own best-selling. The company attaches great importance to the cultivation of talents, meets the individual requirements of talents, and creates a platform for the realization of talents' value. We strengthen the work of serious work, market consciousness, customer awareness of the work concept, so that the company's economic benefits have increased year after year. The market is the foundation of enterprise development, and credibility is the guarantee for the survival of the enterprise. We work hand in hand with friends from all over the world who are in the same boat through storms and hardships, gather the wisdom of the team and the spirit of struggle, build a brand, keep pace with the times, and share extraordinary quality with you.

Mucker Machine

Commissioning of equipment

Adjust the pressure of safety valve on the gear pump:

1) 10MPa pressure gauge is connected to the pressure tap at the outlet of gear pump.

2) Loosen the safety valve of gear pump, and then block the pump outlet;

2) Start the motor and then adjust the pressure of safety valve of gear pump to 10MPa for locking;

3) Remove the pressure gauge, cover the connector and connect the pipeline.

 Adjust the pressure of safety valve on the pilot oil line:

1) 10MPa pressure gauge is connected to the pressure tap at the pilot delivery valve.

2) The handle is pulled to the normal working position. The safety valve on pilot delivery valve is adjusted to 3.5MPa for locking;

3) Remove the pressure gauge, and cover the connector.

 

working mechanism:

 

120


 

 

 


We have occupied a leading position in the field of Zwy-100 High Productivity Mining Excavator Crawler Mucking Loader and will continue to meet the ever-changing application needs of the world. We aim to be worldwide leader in this industry and with this mind; it is our great pleasure to serve and bringing the highest satisfaction rates among the growing market. What we can achieve is because no one takes the cause of intelligent technology more seriously and seriously than us!