
New diesel mining and railway underground loader from China factory
Our company has a large area of its own factory and multiple automatic production lines, which can meet the needs of mass production Underground Coal Mine Drilling Machine, Mucking Rock Excavator, Underground Mining Haggloader and unique product customization needs. We provide complete design, production, assembly, packaging, and other services. If customers have any questions, they can contact us directly. With the concept of "Protect the environment with the power of science and technology, and promote technology with the wisdom of environmental protection", the company has attracted a large number of outstanding talents, completed the company's technical capabilities, established a sound sales and service mechanism, and strive to provide customers with high-quality professional Service, create first-class products, create first-class enterprises. Under the impact and thrust of economic globalization and talent marketization, the scale of our company has leapt to an important position in the industry. We emphasize that both individuals and enterprises should have ambitious goals, and that personal goals are consistent with corporate development goals, and corporate goals are consistent with social development goals.
Model ZWY-120/55L Crawler Mucking Loader is for coal mine, and electric motor is explosion-proof.
Used for dig and transport the rock in tunnel, underground loader, mainly use to dig the rock, and transport the rock to the truck or mine rail cart is a kind of high efficiency equipment for load the rock. Use in mine tunnel, road tunnel, culvert, tunnel dig and load work. New Condition Tunnel Loader Suit for tunnel bigger than 3*3M(w*h), gradient<=22degree, big and medium tunnel. The most suit rock is f<=12, gradient <=600mm, working temperature 2~50 degree. Blast proof motor, the best Chinese filter system, famous brand hydraulic system
Products Advantage
Compact structure
Easy to handle and maintain
Stable and durable performance
High efficiency and saving man power
Energy conservation and environment protection
FAQ:
Q: What is the delivery time ?
A: Normally the leadtime is 10 days after receipt of 30% deposit.
Q: What is the Payment terms ?
A: TT OR LC.
Q: Do you provide equipment operation training?
A: Yes. We can send professional engineers to the working site for equipment installation, adjustment, and operation training.
Q: Can you customize the products as per request ?
A: Yes,we can customize your products.

Model ZWY-120/55L Crawler Mucking Loader Technical Data | |
Excavating Width(mm) | 5300 |
Excavating Length(mm) | 2200 |
Excavating Height(mm) | 3300 |
Excavating Depth(mm) | 700 |
Unloading Height(mm) | 1913(changeable) |
Minimum Loading Height(mm) | 1680(Changeable) |
Unloading Distance(mm) | 2000(changeable) |
Maximum Rotation Angle(°) | ±50 |
Weight(T) | 14.8 |
Dimension(mm) | 6500x2000x2300 |
Loading Capacity(m³/hour) | 120 |
Min Turning Radius(mm) | 5700 |
Climbing Ability(°) | ≤25(hard ground) |
Travelling Speed(m/min) | 2-3.8 |
Applied Tunnel Gradient(°) | ≤18 |
Motor Power(kw) | 45 |
Maximum Material By Size(LxWxH) (mm) | 800x780x700 |
Ground Clearance(mm) | 270 |
Applied Working Section(W*H) (m) | ≥3x3 |
Nominal Working Pressure(Mpa) | 25 |
After years of development, we have become a professional manufacturer of New diesel mining and railway underground loader from China factory. Looking forward to the future, there is a long way to go. We will make more brilliant achievements by adhering to the tenet of 'professional technology and perfect service'. We warmly welcome to establish long-term friendly cooperative relations with like-minded and consistent businessmen to create a better future together! With the enterprise concept of pursuing dream and talking to the world, we have become the industry leader.
You Might Also Like
Send Inquiry










