New Condition Underground Mining Loader

New Condition Underground Mining Loader

Model ZWY-120/55L Crawler Mucking Loader is for coal mine, and electric motor is explosion-proof. Used for dig and transport the rock in tunnel, underground loader, mainly use to dig the rock, and transport the rock to the truck or mine rail cart is a kind of high efficiency equipment for load...
Send Inquiry
Product Introduction

We ensure that our Crawler Excavator, Tunnel Mining Machinery, Tunnel Mucking Loader In Mining is safe and contributes to improving environmental quality and reducing hazards to human health. The company has its own innovative development team and independent patented technology, which is trusted and widely used by users. Innovation is an important means of sustainable development and a basic premise for the survival and development of an enterprise. We insist on continuous innovation to continuously improve the performance of our products and expand their uses to meet the ever-improving needs of our customers.

Model ZWY-120/55L Crawler Mucking Loader is for coal mine, and electric motor is explosion-proof.

Used for dig and transport the rock in tunnel, underground loader, mainly use to dig the rock, and transport the rock to the truck or mine rail cart is a kind of high efficiency equipment for load the rock. Use in mine tunnel, road tunnel, culvert, tunnel dig and load work. New Condition Tunnel Loader Suit for tunnel bigger than 3*3M(w*h), gradient<=22degree, big and medium tunnel. The most suit rock is f<=12, gradient <=600mm, working temperature 2~50 degree. Blast proof motor, the best Chinese filter system, famous brand hydraulic system


Products Advantage

Compact structure

Easy to handle and maintain

Stable and durable performance

High efficiency and saving man power

Energy conservation and environment protection


FAQ:

Q: What is the delivery time ?
A: Normally the leadtime is 10 days after receipt of 30% deposit.

Q: What is the Payment terms ?
A: TT OR LC.


Q: Do you provide equipment operation training?
A: Yes. We can send professional engineers to the working site for equipment installation, adjustment, and operation training.

Q: Can you customize the products as per request ?
A: Yes,we can customize your products.



image001.jpg

Model ZWY-120/55L Crawler Mucking Loader Technical Data

Excavating Width(mm)

5300

Excavating Length(mm)

2200

Excavating Height(mm)

3300

Excavating Depth(mm)

700

Unloading Height(mm)

1913(changeable)

Minimum Loading Height(mm)

1680(Changeable)

Unloading Distance(mm)

2000(changeable)

Maximum Rotation Angle(°)

±50

Weight(T)

14.8

Dimension(mm)

6500x2000x2300

Loading Capacity(m³/hour)

120

Min Turning Radius(mm)

5700

Climbing Ability(°)

≤25(hard ground)

Travelling Speed(m/min)

2-3.8

Applied Tunnel Gradient(°)

≤18

Motor Power(kw)

45

Maximum Material By Size(LxWxH)   (mm)

800x780x700

Ground Clearance(mm)

270

Applied Working Section(W*H)   (m)

≥3x3

Nominal Working Pressure(Mpa)

25


Discount Price Gas Struts for New Condition Underground Mining Loader. We will meet your needs with the belief of continuous progress and innovation. We look forward to building a better future with you! We are pursuing the corporate philosophy of 'people-oriented, meticulous manufacturing, teamwork and brilliance'. Strict quality management, perfect after-sales service, and reasonable market prices are the prerequisites for us to stand in competition. We hope to build a brilliant tomorrow with you.

Send Inquiry

Home

skype

E-mail

Inquiry