Mining P30b Rake Bucket Rock Loader with 600mm/900mm Rail Gauge

Mining P30b Rake Bucket Rock Loader with 600mm/900mm Rail Gauge

Mucking loader with breaking hammer is widely used for coal driving and cutting in the narrow and restricted tunnel of coal mine,no blasting is required. It is also used for driving and tunneling in the tunnel of metal mine,non-metal mine, hydropower project,subway and railway station...
Send Inquiry
Product Introduction

The Underground Mucking Machine, Tunnel Boring Machine, Underground Digging Machine from our company has won orders from large domestic and foreign group companies due to the advanced technology and excellent quality. With the continuous application of new products and technologies, and the continuous improvement of customer expectations, the competition faced by enterprises has been increasing. Hope to obtain your inquiries for any pleased co-operation. We expect to achieve effective allocation of technology, production and service elements.

 Mining Loader

Mucking loader with breaking hammer is widely used for coal driving and cutting in the narrow and restricted tunnel of coal mine,no blasting is required.

It is also used for driving and tunneling in the tunnel of metal mine,non-metal mine, hydropower project,subway and railway station project,national defence construction project etc.,no blasting is required.


Mucking loader with breaking hammer also can be used for loading bulk material in the open-air operation.


Mucking loader also can be used for danger removal with its working boom.

Mucking loader with breaking hammer can repair bottom and side of tunnel,and break bigger rock into smaller after undertaking blasting .



Use of mucking loader

.The operations of working mechanism cannot be carried out against the obstacle (such as the tunnel wall), which may cause damages to the hydraulic cylinder, hinge bolts or steel structure.

.The working mechanism cannot be used for impact operations (such as impact of embedded bed or tunnel bottom), which may cause damages to the hydraulic cylinder, hinge bolts or steel structure. The impact operations shall be avoided especially when the working mechanism is in a fully extended position and moves to the check block at the mechanical end.

.It is strictly prohibited to move the working mechanism to the extreme position of check block at the mechanical end (crank effect).

.This equipment cannot be used for lifting operations; that is, the working mechanism cannot be used to handle any materials. The working platform cannot be installed too.



.During tunneling, certain working point shall always be used as a starting point, and the tunneling shall gradually extend from that point. The continuous extension of a tunneling point can make the daily footage exceeding the continuous alternating extension of several working points.


Mucking Loader Model STB-120 Technical Data

Excavating Width(mm)

5300

Excavating Length(mm)

2200

Excavating Height(mm)

3300

Excavating Depth(mm)

700

Unloading Height(mm)

1913(changeable)

Minimum Loading Height(mm)

1680(changeable)

Unloading Distance(mm)

2000(changeable)

Maximum Rotation Angle(°)

±50

Weight(T)

12

Dimension

9000x2000x2300

Loading Capacity(m³/hour)

120

Min Turning Radius(mm)

6000

Climbing Ability(°)

≤25(hard ground)

Travelling Speed(m/min)

2.1-3.8

Electric Motor Power(kw)

45/55

Maximum Material By Size(LxWxH) (mm)

800x780x700

Ground Clearance(mm)

270(changeable)

Applied Working Section(W*H) (m)

3.0x3.0

Nominal Working Pressure(Mpa)

25/35

Applied Tunnel Gradient(°)

30

Mining Loader 

 



Based on the basic principles of customer satisfaction with quality, service and technology, we continue to strengthen the overall strength of the company and manufacture Mining P30b Rake Bucket Rock Loader with 600mm/900mm Rail Gauge that satisfies customers. We know that we need to scientifically grasp the characteristics of the times and improve the core competitiveness of enterprises through the innovation of new technologies in order to win market competition. In order to carry out our goal of 'customer first and mutual benefit' in the cooperation, we establish a professional engineering team and a sales team to supply the best service to satisfy our customers' requirements.

Send Inquiry

Home

skype

E-mail

Inquiry