
Hydraulic Water Well Drill Rig Drilling Machine
We are determined to provide our customers with the best quality Tunnel Muck Loading Equipment, Tunneling Machine, Mine Tunnel Construction Equipment and services to continuously meet the growing demand of the building energy-saving market. We encourage employees to actively participate in business operations, work together, strengthen internal unity, and enhance corporate cohesion, so as to integrate individuals and the group, and gather a large number of talents for the group. We strengthen responsibility management in various fields such as integrity management and employee development. We are committed to producing top-quality and eco-friendly textile products and accessories.
Gold Exploration Equipment
Mucking loader (haggloader) mainly used for narrow space mining operations, such as metal mines, diversion tunnels, its role is to collect the gravel soil materials and delivery, loading. The machine pushes the rocks to scoop the rocks and shovels the stones into their belt conveyors through the bucket. The conveyor unloads rock from the tail into dump trucks, trolleys, or other loading equipment. You can also use the backhoe to pick up the distant rock arm, you can also use the bucket to clean the face
Mucking loader is also called excavating loader, integrates multiple functions including excavation, conveying, loading, running, Because of its high working efficiency, strong ability to adapt the space, less polluting to the air inside of the tunnel, it becomes a very important mechanical equipment in tunnel construction.Wheeled slag machine wide range (from left to right range of up to 4.5 meters, up to 2.8 meters on the ground, the ground up to 0.8 meters) ,It can be full-face loading of gravel, leaving no dead ends, do not need to manually clean up Site, you can also digging on both sides of the roadway ditch.Gold Exploration Equipment
Operating Procedure
1. Start the machine. Start the machine as per the follow steps:
(1) Turn on the main electrical power switch
(2) Operate the stick of the starting switch to start the machine and the light will turn on
(3) Then re-click the starting button and stop button,
(4) Watch the rotating direction of the oil pump motor or radiator motor.
(5) If the direction is not correct, turn the stick of the starting switch to another position and re-start the oil pimp and fan motor.
2. Start the oil pump motor.Gold Exploration Equipment (1) There need three to five minutes waiting time after the pump motor is started.
(2) In winter, there need two to three times to start the oil pump to let the oil flow gradually. And then re-start again. If we do not do this, the pump may get broken down because the oil may not be enough yet.
3. Put the stick of the hand-operated direction valve in the working position, unfold the pushing plate, gently landing the transporting trough’s head to the floor to let it enter the working position.
4. Operate the machine forward and get the slag together. The ground is bulldozed at the same time.
5. Turn on the scraper chain and idle clockwise one to two minutes.
6. Main operation methods:
(1) Large arm up, large arm down, arm turn right, arm turn left.
(2) Small arm up, small arm down.
(3) Using the bucket, small arm and large arm to catch the slag into the transporting trough.
(4) Then the scraper conveyer conveys the slag to side dump wagon or other mine transporting equipment.
Our company constantly strengthen our internal strength, work hand in hand with all walks of life, strive to create excellent Hydraulic Water Well Drill Rig Drilling Machine for our customers while constantly expanding market share. Any interest, please feel free to contact us. The company's staff will strive to provide you with high-quality pre-sale, sales and after-sales service, and work together with you to create a better future.
You Might Also Like
Send Inquiry









