
High Efficiency! Hf-4t Concrete Core Drilling Machine
Each of our Electric Excavator For Coal Pillar, Mining Excavator, Tunnel Mining Equipment is carefully manufactured and inspected in strict accordance with quality standards to ensure the best quality is sent to our customers. We are proud of our reputation for delivering exceptional value and service to our clients. In the course of development, we gather strong spiritual power to boost the leap forward development of enterprises.
Gold Exploration Equipment
Mucking loader (haggloader) mainly used for narrow space mining operations, such as metal mines, diversion tunnels, its role is to collect the gravel soil materials and delivery, loading. The machine pushes the rocks to scoop the rocks and shovels the stones into their belt conveyors through the bucket. The conveyor unloads rock from the tail into dump trucks, trolleys, or other loading equipment. You can also use the backhoe to pick up the distant rock arm, you can also use the bucket to clean the face
Mucking loader is also called excavating loader, integrates multiple functions including excavation, conveying, loading, running, Because of its high working efficiency, strong ability to adapt the space, less polluting to the air inside of the tunnel, it becomes a very important mechanical equipment in tunnel construction.Wheeled slag machine wide range (from left to right range of up to 4.5 meters, up to 2.8 meters on the ground, the ground up to 0.8 meters) ,It can be full-face loading of gravel, leaving no dead ends, do not need to manually clean up Site, you can also digging on both sides of the roadway ditch.Gold Exploration Equipment
Operating Procedure
1. Start the machine. Start the machine as per the follow steps:
(1) Turn on the main electrical power switch
(2) Operate the stick of the starting switch to start the machine and the light will turn on
(3) Then re-click the starting button and stop button,
(4) Watch the rotating direction of the oil pump motor or radiator motor.
(5) If the direction is not correct, turn the stick of the starting switch to another position and re-start the oil pimp and fan motor.
2. Start the oil pump motor.Gold Exploration Equipment (1) There need three to five minutes waiting time after the pump motor is started.
(2) In winter, there need two to three times to start the oil pump to let the oil flow gradually. And then re-start again. If we do not do this, the pump may get broken down because the oil may not be enough yet.
3. Put the stick of the hand-operated direction valve in the working position, unfold the pushing plate, gently landing the transporting trough’s head to the floor to let it enter the working position.
4. Operate the machine forward and get the slag together. The ground is bulldozed at the same time.
5. Turn on the scraper chain and idle clockwise one to two minutes.
6. Main operation methods:
(1) Large arm up, large arm down, arm turn right, arm turn left.
(2) Small arm up, small arm down.
(3) Using the bucket, small arm and large arm to catch the slag into the transporting trough.
(4) Then the scraper conveyer conveys the slag to side dump wagon or other mine transporting equipment.
Over the years, all employees of the company have consistently pursued the quality strategy and the spirit of excellence. We pay close attention to the development trends of High Efficiency! Hf-4t Concrete Core Drilling Machine at home and abroad, and timely penetrate them into the management and development concepts to better serve our customers. Our products have been exported to all over the world. The company has strong technical force, with loose policies and free development space, attracting many top management talents and technical personnel.
You Might Also Like
Send Inquiry









