
Gold Mining Machine for River Sand Gold From Haijie
Our vision is to become an integrated enterprise that focuses on customer needs and can provide customers with professional Coal Mine Drilling Machine, Mining Tunnel Loading Machine, Rock Loading Machine and convenient services. We will always strive to meet the needs of customers in all directions with high-quality products and dedicated services. Our business philosophy is: 'the pursuit of excellence, hand in hand', advanced management is the foundation of our company. At the same time, we will work with our partners to provide and establish a more complete system and better products, better serve customers, and expand the scope of product dissemination.
Gold Mining Machine
Model STB-60S Crawler Mucking Loader:
Hydraulic System
1,The main parts are top brands from home and abroad, the whole design is reasonable afrer several generations of updating
2,Overload feedback system is optional
3,Air cooling radiator with great power to ensure the steady of system oil temperature
4,Precision filter to prevent pollution of the hydraulic system, to protect the oil pumps and other hydraulic components.Gold Mining Machine
Working Arm
1,The structure parts of the big and small arm can be adjustable to adapt different working section
2,The portal frame is connected with the conveying trough, to extend the working range and the height of arm to remove danger
3,The bucket is made of imported wear resistant steel, improving the durability of use
4,The bush is made by NSK(Japan),reducing the wearing of pin rolls and bushes, better for maintenance
Optional
Preparations before Starting the Machine
1. Check the hose assembly of the on site machine. All the parts that could touch the hardware of the machine and the sharp points and those constantly used and abraded parts should be wrapped with soft rubber to avoid the broken of the first layer rubber and steel wire. The top of the oil tank should be covered with tarpaulin to prevent water in.Gold Mining Machine
2. Train the driver. Before operating this machine, the driver should be fully familiar with the manual description. Be well known the structure, the working principle, property, operating methods and maintenance skill. Memorize the function and position of each buttons and memorize the schematic diagram of each operating stick. Only the examination qualified could operate the machine.
3. Recommend using No. 46 antiwear hydraulic oil. In winter we recommend No. 32 antiwear hydraulic oil. The hydraulic oil should be kept clean and the dirty container is prohibited. The oil should be filled through the designated filling points. The oil tank capacity of this machine is 500 liter and the oil should be kept in the two-thirds of the oil indicator. If the oil is inadequate, immediate supplement should be done.
4. Check each fastens. Make sure the electronic component and hydraulic component are in well condition. Abnormity should be eliminated immediately.
5. Check if all the operating sticks are in the stop position.
6. The main electrical power switch and external cable should be self-prepared by user. The specification should as per the list of accessories.
We take the market as the center, strive for survival by quality, innovate continuously and serve attentively. We have a high reputation in the field of Gold Mining Machine for River Sand Gold From Haijie. We take consumer demand as the center, develop the market with quality, develop with innovation, and win trust with service. In return for the support of our customers, our company is in line with the business philosophy of moral integrity and integrity to meet the needs of customers and manufacturers with efficient after-sales service, high-quality products and competitive price.
You Might Also Like
Send Inquiry










